Project Description: Project of 132kV and 230kV Transmission Lines in Myanmar. Currently it is contracting stage and it will implement in 2022-2025.
Delivery Time: 8/26/2023
Stage 1 Product Supplied from GL Fiber:
1)24 CORE MM F/O CABLE-24Core 88 mm G652 Tested D TYPE.88 (16.000 mt)
2)24 CORE MM F/O CABLE-24Core 88 mm G652 Untested D TYPE 88 (16.000 mt)3)24 CORE MM F/O CABLE-24Core 96 mm G655 Untested C TYPE 96 (16.000 mt)
4)48 CORE MM F/O CABLE-24Core 96 mm G652 Untested C TYPE 96 (96.000 mt)